High School Ginko Bordeaux

New construction of a grammar school. Cassettes made of Corten steel with a rust stop were used, which were attached to the front from the outside by invisible bolts. Half of each cassette is solid, while the other half is perforated. For the project, pre-ixed Corten steel was used which was attached to the entire front and roof. The building was completed in 2017.